EBS has years of experience in advising
owners of fire damaged buildings. Ensuring that the drying process is
carefully managed to minimise damage to the building.
EBS will carry out a detailed inspection of the property to identify
the moisture distribution, the vulnerable materials and advise on the
type of drying regime to minimise damage to the building and the time
scale of the drying out period.
EBS staff has been involved with environmental monitoring and drying out a range buildings following fire and flood damage including Hampton Court Palace, Windsor Castle, Cullen House, Jordans meeting room, Stormont building, McVities biscuit factory and Guys Hospital (New End).
|